NORTH CURTAIN WALL GOING UP AT BEAVER

Posted on April 20th, 2017 by Gretchen Neeley

Posted under: _BEAVER R+D Center, Academic, construction

The expression of the vertical curtain wall framing members is pronounced before the glass is installed and remains clearly visible on the interior.

However, the final exterior expression of the north facade is to suppress all vertical framing by using a structural silicone joint. The horizontal joints are awaiting their custom profile caps.

 

Comments Off on NORTH CURTAIN WALL GOING UP AT BEAVER

OFFICE VISIT TO BEAVER

Posted on March 3rd, 2017 by Nicole Sakr

Posted under: _BEAVER R+D Center, Academic, construction

We took an office trip today to check out construction progress at Beaver, Gretchen gave us a tour.

 

cracks!

future ramp

Comments Off on OFFICE VISIT TO BEAVER

Tanderrum Bridge Construction Timelapse!

Posted on February 12th, 2017 by Nicole Sakr

Posted under: _Tanderrum Bridge, construction

Comments Off on Tanderrum Bridge Construction Timelapse!

BEAVER CONSTRUCTION UPDATE

Posted on November 28th, 2016 by Nicole Sakr

Posted under: _BEAVER R+D Center, Academic, construction

The structure for the new third floor addition and the northern facade profile are in place.

Bleacher structure in place

Photos by Erica Dorenkamp

Comments Off on BEAVER CONSTRUCTION UPDATE

‘One Spadina Crescent Integrates New Into Old’

Posted on November 24th, 2016 by Nicole Sakr

Posted under: _Daniels Building, construction, Press

Annemarie Brissenden writes on NADAAA’s project for DFALD that is nearing completion. Read on HERE.

“That sense of interconnectedness — between past and future, town and gown, within the building itself — was done by design”

photo by NEILAND BRISSENDEN-edit

photo by NEILAND BRISSENDEN

Comments Off on ‘One Spadina Crescent Integrates New Into Old’

DFALD CONSTRUCTION UPDATE

Posted on November 15th, 2016 by Nicole Sakr

Posted under: _Daniels Building, construction

New photos of One Spadina! Also check out construction updates from Torontoist and Azure.

IMG_1081-edit

IMG_1156-crop

IMG_1107-edit

IMG_1057-edit

Comments Off on DFALD CONSTRUCTION UPDATE

STRIPPED DOWN!

Posted on September 22nd, 2016 by Nicole Sakr

Posted under: _BEAVER R+D Center, Academic, construction

The existing 2-story library wing at Beaver Country Day has been stripped down to the structure!

And the old classroom building!

Photos by Erica Dorenkamp

Comments Off on STRIPPED DOWN!

BRIDGE SPANS!

Posted on September 12th, 2016 by Nicole Sakr

Posted under: _Tanderrum Bridge, construction

The Tanderrum Bridge is now spanning over Batman Avenue! Read Major Projects Victoria’s post HERE.

tanderrum_span_2016_640px_x_389px

Comments Off on BRIDGE SPANS!

Tanderrum Bridge: Railings

Posted on September 9th, 2016 by achang

Posted under: _Tanderrum Bridge, construction

The Tanderrum Bridge (formerly called Batman Avenue Bridge) construction is well underway. The new bridge project is the second design collaboration between NADAAA and John Wardle Architects and will link Birrarung Marr with the Melbourne Park sports precinct which hosts the annual Australian Open. Learn more about the design and construction process of the railings below with more on the steel structure and the concrete pillars to follow.

 

exploded panel

Above:  A filigree of steel pipes wraps the bridge section in three segments. The sides are repeatable while each middle belly is unique.  

options grid 2

Above: Early tests on the density of filigree pipes and attachment configurations.   

panelization_feb2

The bridge’s unique geometry that follows the topography, spurs to a lookout point, and rises over the highway creating many unique conditions that made standardization a challenge.  It was essential to break the filigree into zones of repeating elements to minimize fabrication time and cost.  Orange represents fully customized sections and the remaining colors represent sections of repeating units.

02_RAILINGBLOCKS

handrail-WHITE

Above: each section of filigree is composed of 5 different bend geometries.  Mixed and matched to create the illusion of a random pattern. 

 

axon_feb2

Above:  each filigree segment is integrated with the guard rail mounted to the edge of the bridge structure and wraps the underside. 

 

Shop mock-ups were critical to finalize the minimum radius of the filigree pipe bends and the detail of attachment hardware.

151015 Prototype Progress Page 001-bw

Above:  Unfinished mock-up of filigree guardrail segment. (photo by JWA)

151015 Prototype Progress Page 003-bw

Above:  Unfinished mock-up gets a thumbs up. (photo by JWA)

 

Construction photos of the railings from July 28, 2016 by Kristoffer Paulsen

_DSC6200-bw

_DSC6198-bw-no jug

_DSC6329-bw

_DSC6300-bw

_DSC6315-bw

_DSC6222-bw

_DSC6221-bw

Tanderrum-bridge-rendering

Above: view with lamps

Comments Off on Tanderrum Bridge: Railings

URBAN TORONTO’S PHOTO OF THE DAY

Posted on August 17th, 2016 by Nicole Sakr

Posted under: _Daniels Building, construction, Press

Jasonzed’s aerial photo of One Spadina is Urban Toronto’s Photo of the Day. See his other shots of DFALD here.

9e6eed9f-91e9-4501-9f9a-7aec04f1078d_zpsybgtudo0

Comments Off on URBAN TORONTO’S PHOTO OF THE DAY