STRIPPED DOWN!

Posted on September 22nd, 2016 by Nicole Sakr

Posted under: _BEAVER R+D Center, Academic, construction

The existing 2-story library wing at Beaver Country Day has been stripped down to the structure!

And the old classroom building!

Photos by Erica Dorenkamp

Comments Off on STRIPPED DOWN!

0 Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.