Azure: How NADAAA saved the DFALD ceiling

Posted on December 13th, 2017 by Nicole Sakr

Posted under: _Daniels Building, Academic, Press

“NADAAA’s hyperbolic paraboloid solution, says Faulkner, was significantly different from how the contractor was envisioning it. They had pictured a series of specialty metals crafted into an armature. The full-scale model proved that any framer could construct the ceiling using standard drywall, scoring it to create the curve.”

Read on HERE.

Comments Off on Azure: How NADAAA saved the DFALD ceiling

0 Comments

No comments yet.

RSS feed for comments on this post.

Sorry, the comment form is closed at this time.